Profit Glyph
  • Stock
  • World News
  • Business
  • Investing
Investing

Munda Gold Mine Mining Progresses: First Blast

by admin June 19, 2025
June 19, 2025

Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to provide an update on mining of the Starter Pit at the Munda Gold Mine, 5km from Widgiemooltha, Western Australia.

Highlights

  • First blast 17 June 2025.
  • Mining is well underway in Starter Pit.
  • Approximately 70,000 BCM mined in first month.
  • Largely free-dig to date.
  • Site preparation for Waste Dump and ROM pads completed.
Management Comment

Managing Director, Mark English, said:

“It’s a momentous time in our progression and development of the Company, we are delighted.

“Mining is in full swing and all activities are progressing as we expected. Nothing is holding us back. We are achieving our targets and are exactly where we expected to be in the mine development.

“We are pleased to be monetising our major asset in such a bullish gold market, the timing is excellent. It is a great place to be as an unhedged gold producer,” said Mr English.

Approximately 70,000 BCM (Bank Cubic Metres) of material have been mined at Munda over the first 4 weeks of operations from a pit design encapsulating 380,000 BCM. Mining to this stage has been largely free-dig with the first blast completed 17 June 2025.

Auric personnel are utilising a dry hire fleet comprising a 125t excavator and four 40t articulated ‘Moxi’ dump trucks together with relevant ancillary equipment.

Both RC grade control and blast hole drilling, together with blast supervision is managed by Kalgoorlie-based Total Drilling Services Pty Ltd.

The Company has estimated that approximately 125,000 tonnes of ore will be extracted from the Starter Pit at a grade of 1.8g/t Au1. Most of that ore will be mined toward the base of the Starter Pit, during the last two months of operations. The Starter Pit is scheduled for completion in October.

Munda has an estimated resource of 145,000 ounces of gold at a 0.5g/t cut-off2. Once the Starter Pit is finished Auric expects to complete detailed planning for a larger pit, to commence in 2026.

The Company is fully funded to mine the Starter Pit at Munda from the proceeds of gold sales from the Jeffreys Find Gold Mine near Norseman.

Click here for the full ASX Release

This post appeared first on investingnews.com

previous post
Brunswick Exploration
next post
Nifty Copper Project Virtual Site Visit

Related Posts

Syntholene Selects Papadakis Engineering as Integration Partner for...

March 13, 2026

Lahontan Announces Private Placement

March 13, 2026

Summit Royalties Announces Agreement to Acquire Royalty on Newmont’s...

March 13, 2026

Harvest Gold Expands Its Mosseau Property Along Strike...

March 13, 2026

CHARBONE presentera a la conference Hydrogen East et...

March 13, 2026

Tartisan Nickel Corp. Intersects 24.6 Metres of 0.71%...

March 13, 2026

NevGold Mobilizes Drill To Test Historical Leach Pads...

March 13, 2026

LaFleur Minerals Inc.Taking Key Steps to Advance Position...

March 13, 2026

Cartier Cuts 7.1 g/t Au over 8.0 m...

March 13, 2026

Silver Stocks: 5 Biggest Silver-mining Companies in 2026

March 11, 2026

    Sign up for our newsletter to receive the latest insights, updates, and exclusive content straight to your inbox! Whether it's industry news, expert advice, or inspiring stories, we bring you valuable information that you won't find anywhere else. Stay connected with us!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    World News

    • Trump supporters are more likely to expect a collapse into fascism

      April 22, 2025
    • Wrong-way driver passes Harris motorcade on Milwaukee highway

      April 22, 2025
    • Trump meets definition of ‘fascist,’ says John Kelly, his former chief of staff

      April 22, 2025
    • The practical and moral difficulties of deporting millions draw closer

      April 22, 2025
    • Trump’s exaggerated claim that Pennsylvania has 500,000 fracking jobs

      April 22, 2025

    Latest Posts

    • Syntholene Selects Papadakis Engineering as Integration Partner for Novel Thermal-Hybrid Synthetic Fuel Demonstration Facility Heat Exchanger System

      March 13, 2026
    • Summit Royalties Announces Agreement to Acquire Royalty on Newmont’s Saddle North Deposit

      March 13, 2026
    • Lahontan Announces Private Placement

      March 13, 2026

    About Us

    • Cookie Notice
    • Privacy Policy
    • Terms & Conditions
    • Trading Tools

    Copyright 2026 — {domainName_first_up_spaces}. All rights reserved

    Profit Glyph
    • Stock
    • World News
    • Business
    • Investing